The increase in computation time jobs
Message boards :
Problems and bug reports :
The increase in computation time jobs
Message board moderation
Author | Message |
---|---|
Send message Joined: 4 Aug 14 Posts: 5 Credit: 18,828,480 RAC: 0 |
Job was considered to be much longer. For example for computer http://asteroidsathome.net/boinc/show_host_detail.php?hostid=114053: before: http://asteroidsathome.net/boinc/workunit.php?wuid=20124481 after: http://asteroidsathome.net/boinc/workunit.php?wuid=20469133 For computer: http://asteroidsathome.net/boinc/show_host_detail.php?hostid=114280 before: http://asteroidsathome.net/boinc/workunit.php?wuid=20298897 after: http://asteroidsathome.net/boinc/workunit.php?wuid=20383652 For computer: http://asteroidsathome.net/boinc/show_host_detail.php?hostid=114277 before: http://asteroidsathome.net/boinc/workunit.php?wuid=20298343 after: http://asteroidsathome.net/boinc/workunit.php?wuid=20504613 and so on for the other computers |
Send message Joined: 1 Apr 13 Posts: 37 Credit: 153,496,537 RAC: 0 |
Last modified: 6 Sep 2014, 9:18:36 UTC Wrong! These long wu's are the normal running times at asteroids. Look at your older results: http://asteroidsathome.net/boinc/workunit.php?wuid=19533687 |
Send message Joined: 4 Aug 14 Posts: 5 Credit: 18,828,480 RAC: 0 |
|
Send message Joined: 1 Jan 14 Posts: 300 Credit: 32,049,939 RAC: 14,748 |
Again great job length. It is when a project chooses to award a fixed number of credits per workunit completed and validated. Some projects choose to do this way, some projects choose other ways, there are several. |
Send message Joined: 12 Sep 14 Posts: 29 Credit: 305,524 RAC: 253 |
It is when a project chooses to award a fixed number of credits per workunit completed and validated. Some projects choose to do this way, some projects choose other ways, there are several. IF tasks are taking longer due to MORE DATA BEING analyzed the we ALL deserve MORE CREDITS. |
Send message Joined: 1 Jan 14 Posts: 300 Credit: 32,049,939 RAC: 14,748 |
Last modified: 27 Sep 2014, 10:42:47 UTC It is when a project chooses to award a fixed number of credits per workunit completed and validated. Some projects choose to do this way, some projects choose other ways, there are several. 1 billion credits and 5 bucks can get you a latte at Starbucks! Without the 5 bucks though you are NOT getting your latte. |
Send message Joined: 5 Jul 14 Posts: 38 Credit: 1,262,880 RAC: 0 |
It is when a project chooses to award a fixed number of credits per workunit completed and validated. Some projects choose to do this way, some projects choose other ways, there are several. Lol |
Send message Joined: 4 Aug 14 Posts: 5 Credit: 18,828,480 RAC: 0 |
|
Send message Joined: 8 Jan 13 Posts: 4 Credit: 2,519,280 RAC: 0 |
|
Message boards :
Problems and bug reports :
The increase in computation time jobs